Plimoth Plantation Craft Center

As design/build consultant to Plimoth Plantation for over 10 years, we were delighted to be involved in a project which will be a notable part of the living exhibit. At the outset of our consultation, we prepared a 500-page analysis of all of the standing real estate at the Plantation, looking at a program for catching up with deferred maintenance.  The Architectural Program consisted of numerous stakeholders; Native Indians, historians, retail sales and various artisans.  This exciting project enhances the visitor experience to allow exposure to 17th Century artisan trades techniques in a comfortable environment. New and upgraded toilet and refreshment facilities are provided to enhance the comfort of the museum experience.

×

Plimoth Plantation Capital Improvements, Plymouth, MA

This relationship began when ConServ was hired to create a five year capital improvements plan and schedule of renovations to the Plantation.  Since then we have performed multiple renovation projects to the property, and continue to maintain an ongoing relationship under which we will continue to renovate at the organization’s request.

×

Gruntal & Company Commercial Office Building, Osterville, MA

ConServ worked with this international firm to create a 2000SF work environment designed to the client's corporate finish standards.  The goal was to fast track construction drawings, permitting, and completion of the construction work.  The process of converting a residence to a commercial office was designed to utilize as much of the existing structure as possible and incorporate high end finishes throughout the building.  Gruntal and Company was sold to Ryan, Beck &Company soon after the completion of the project. 

×

Cape Cod Gymnastics

Ground up construction of 9,720 SF pre-engineered steel building designed for a single tenant. New Construction; 135' X 72', 9,720 SF Steel Building on 1 Acre; 18’ height clear span, Indoor gymnasium with two party rooms, bathrooms, office, in ground foam pit system, in ground trampoline, multiple floor uses, 40 Parking Spaces

×

St. Peters Episcopal Church

Foundation replacement and structural shoring to save original structure from collapse. Integration of new elevator for handicap accessibility. This was a challenging project that required careful coordination between multiple trades in order to successfully save the church while maintaining its original character. ConServ coordinated every aspect of the project and managed to provide a final product to everyone’s satisfaction, the town, the committee and the congregation.  The building is now back to its original glory.

×