Dunkin Donut Bakery

Built state-of-the-art 20,000SF central bakery facility for required daily donut and muffin manufacturing.  Ground-up construction of exterior masonry bearing wall with bar joist and deck roof.  High efficiency HVAC and product refrigeration systems.  Hi-bond epoxy floor and floor drain system.

×

Cape Cod Fabrications

Addition of 10,000 SF to existing building to create manufacturing facility for high end residential metal projects. Designed and constructed slab on grade, steel building addition with multiple overhead doors and restructured common wall with new openings.

×

TWZ, LLC

Ground up construction of 10,000 SF pre-engineered steel building designed for multiple tenants. Steel Building on 1.66 Acres; 8- 20'X50' Warehouse Units; 24’ height; Canopied Sidewalk; 40 Parking Spaces

×

Dirigo Spice

Renovations to 50,000 SF building to create new corporate spice manufacturing headquarters. Extensive demolition of interior partitions, plumbing, electrical and HVAC systems prior to the start of the renovation work. Built 5000 SF of office and laboratory space. 45,000 SF was divided into warehouse and processing areas containing modern equipment integrated into all of the building components from the foundation to the roofing system, (i.e.; choppers, blenders, storage hoppers, conveyers and chutes).

×

Teledyne Benthos

High technology engineering, laboratory and support space of 30,000 SF. Ground up design and construction of a truss joist and column frame, open-web bar joist roof structure, concrete slab on grade addition to a hi-tech underwater technology manufacturer. Complex environmental permitting trajectory and site design led to aggressive value-engineering to create a durable structure which remained a ‘value-proposition’, despite many required regulatory expenses.

×