ConServ Group designed and constructed the structural steel support system and metal framing to create 3,000 SF of mezzanine space over the existing floor area.  One single pour of 35 cubic yards of concrete completed the slab on the mezzanine which will be partitioned for new rooms and office space.  CDF is a manufacturer of plastic goods for industrial uses.  The construction was completed during continued operation of the plant.

Structural steel and finished concrete mezzanine deck.